How to QA a stockpile surface model before you sign the tonnage figure

Overhead drone view of a ridged gravel stockpile at a quarry, with low sun casting shadows down each rib of the slope.

Your name goes on the tonnage figure, not the drone pilot's. If a surface model came from a contractor, an internal UAS crew, or an automated weekly flight, the review before sign-off is yours to run. Most of the failure modes on a stockpile surface are predictable, and most of them can be caught in twenty minutes with the right eye on the right layers.

Start with the control, not the pile

Before you look at the pile shape at all, check what the surface was tied to. Ground control points used to georeference the model should be separate from the checkpoints used to validate it. If the same points did both jobs, the residuals reported are meaningless, they're just telling you the model agrees with itself.

Confirm the datum and projection match what the rest of the site uses, including the stockpile's own base surface. A model that's internally consistent but shifted half a meter in elevation from the baseline will throw tonnage off by a margin that has nothing to do with the pile and everything to do with coordinate handling. If there's a known monument or hard surface on site, like a concrete pad or a weighbridge approach, check the model's elevation against it directly rather than trusting the processing report's summary numbers alone.

Hunt for the artifacts that move volume without moving material

A handful of errors show up again and again on stockpile surfaces, and they're worth checking for by name:

Doming. Classic photogrammetric bowing where the center of the surface lifts relative to the edges, usually from weak oblique coverage or poor camera calibration. On a large pile this inflates volume across the whole top, not just one corner, so it's easy to miss on a quick glance and easy to catch on a cross-section.

False highs from dust, steam, or standing vegetation. Coal stockpiles that are off-gassing, or aggregate piles with dust still settling from a dump, can register as elevated surface where there's actually nothing solid. Weed growth on an inactive pile does the same thing on the shrink side of the ledger, adding apparent volume that isn't tonnage.

Equipment caught mid-flight. A loader or dozer working the pile during the mission leaves either a spike (the machine itself, modeled as terrain) or a hole (a shadowed gap where it blocked the view). Either one sits right where reclaim activity usually happens, which makes it worse, not better, since that's the zone most likely to matter for the current tonnage call.

Toe line drift. Low-contrast, low-texture material at the base of a pile, especially wet coal fines or dark aggregate in shadow, is where point density thins fastest. Check whether the modeled toe matches the physical edge of the stockpile or has crept outward onto the pad, which quietly adds a wedge of phantom volume around the whole base.

Check it against last week, not just against itself

A single surface model can look clean and still be wrong. The faster check, once you're on a weekly or near-weekly cadence, is comparing the new surface to the last accepted one. A pile that didn't move much shouldn't show a volume swing that doesn't match the reclaim and dump records for the week. If it does, go back to the artifact list above before you touch the tonnage number, since a jump like that is almost always one of those five problems, not real material movement.

Run a cut through the pile, roughly through its highest point and down both faces, and look at the profile against what you'd expect for the angle of repose of that material. A profile that's too flat on top or flares oddly at the base is visible in a cross-section long before it shows up as a volume discrepancy that's hard to trace back.

Finally, check that the deliverable itself, not just the number, gives you what you need to defend the figure later: the surface model file, the control report, and a clear record of which flight date it came from. That's the standard a weekly photogrammetric survey should hold itself to, and it's the baseline Stockpile Volume builds every pile model to meet, as a downloadable surface alongside the tonnage figure rather than a number with no paper trail behind it.

If the QA steps above sound like more than you want to repeat by hand every week on every pile, see how Stockpile Volume handles the surface and the control together.